r-pod Production Timeframe |
Post Reply |
Author | |
admin
Admin Group Joined: 17 Feb 2009 Location: Midwest Status: Offline Points: 191 |
Post Options
Thanks(0)
Posted: 09 Mar 2009 at 6:19am |
We are getting reports that owners are having a difficualt time finding the r-pod floorplan they want to see in stock at their dealer and that the average wait time on an order is being quoted at around 4-6 weeks.
In speaking with Forest River, the reason the order time is in this range is attributed to how Forest River is producing the r-pod. The r-pod line is being built on the same line / facility as the Surveyor travel trailer and Forest River is alternating production between the two product lines. It appears that production is rotating between the brands every 2-3 weeks or so depending on demand.
|
|
Post Reply | |
Tweet
|
Forum Jump | Forum Permissions You cannot post new topics in this forum You cannot reply to topics in this forum You cannot delete your posts in this forum You cannot edit your posts in this forum You cannot create polls in this forum You cannot vote in polls in this forum |